Construction of Duke water reservoir and CTI Transmission pi...
Construction of Duke water reservoir and CTI Transmission pipelines
Procurement Process : ITB - Invitation to bid
Office : UNDP-PAL - PALESTINIAN TERRITORIES
Deadline : 29-May-23 @ 07:00 AM (New York time)
Published on : 01-May-23 @ 12:00 AM (New York time)
Development Area : OTHER
Reference Number :UNDP-PAL-00084
Contact : Procurement Analyst - [email protected]
This specific tender is managed via the new supplier portal system of UNDP which will in the future replace the online eTendering system currently in use. If you are interested in submitting a bid for this tender, you must subscribe following the instructions in the user guide. If you have not registered a profile with this system, you can do so by following the link for Supplier Registration.
If you already have a supplier profile, please login to the Supplier Portal, then search for the negotiation using the reference number UNDP-PAL-00084, following the instructions in the user guide.
Introduction :
Lot1:
Construction of Transmission pipelines From Duke reservoir to CTI existing tank and part of the line from duke reservoir to Nuweimeh reservoir.
The General Scope
Trench excavation, supplying, laying, installation, backfilling, testing, disinfection of the HDPE pipelines for the two lines described above with all related chambers and fittings as shown in the drawings.
Lot 2:
Construction of underground water reservoir in the “Duke Al Fuka” area that will serve the that will store water for CTI and al duke al Fuka Municipality.
The General Scope
The project involves the construction and commissioning of a pile retaining wall, excavation, and the building of a three-compartment underground water reservoir with mechanical piping connecting the tank to both the feeding line and transmission lines through pumps. Additionally, boundary walls will be constructed, along with site drainage and landscaping, and an asphalt yard. The project will also include the installation of all necessary control and monitoring equipment to ensure proper functioning of the water storage and distribution system. The proposed retaining wall will be built using reinforced concrete piles and optional cladding wall on pile face.
Documents :
Negotiation Document(s) (Before Accessing other negotiations Document(s), please click on this link)